CHAPTER 4
The results achieved during this period complement the development outcomes accomplished in previous years. Figure 26 highlights key development results from operations completed or matured between 2018
and June 2025. 86 The figures in parenthesis indicate the amount that has increased compared to the results reported in the previous year, underscoring continued progress and impact.
Figure 26 | Main documented development results of OPEC Fund projects completed/reaching EOM 2018 – June 2025
roads built/ rehabilitated (+246) 11,809 km
annual users of transport infrastructure (+2.67 m) 3.47 m
population benefiting from health projects (+1.38 m) 33.94 m
healthcare facilities built/upgraded (+318) 438
farmers benefited (+82,045) 2.26 m
households with new or improved water connections (+389,063) 651,373
3.49 m
transmission lines built/rehabilitated (+8,799) 24,522 km
jobs supported (+54,921) 213,234
in trade facilitated (+774 m) US$ 3.9 bn
households with new or improved electricity
connections (+305,005)
women empowered (+247,944) 789,180
MSMEs financed (+6,460) 354,451
educational facilities built/ upgraded (+7) 174
students benefited (+14,241) 224,462
measures for stronger institutions and legal frameworks (+59) 59
6,159 MW
households supported with emergency or other financial assistance (no change) 340,800
of water pipes/ trunk systems (+1,254) 13,253 km
of land improved (+11,562) 410,451 ha
in energy capacity installed/refurbished, of which 1,504 MW renewable (+131 total capacity, no change in renewable capacity)
86 Annex III outlines the composition of all projects reviewed as part of this analysis and discusses methodological aspects and data limitations.
86
87