Climate Finance Report 2026

Chapter 6 | PROJECTS

sharply in recent years, while delays in large hydropower projects have constrained the pace at which new capacity comes on stream. At the same time, the country’s develop- ment strategy continues to rely on hydropower as a source of revenue, export earnings and clean energy. New domes- tic generation matters, because it helps sustain Bhutan’s low-carbon development model, supports cross-border power trade and reinforces the economic logic of investing in renewable infrastructure. 10 The operation aligns most directly with SDG 7 (Affordable and Clean Energy) through additional renewable power generation, SDG 9 (Industry, Innovation and Infrastructure) through strategic energy infrastructure, SDG 13 (Climate Action) through lower-emission electricity generation and SDG 8 (Decent Work and Economic Growth) through its contribution to exports, revenue generation and produc- tive power supply. In terms of the OPEC Fund’s Strategic Framework 2030 the project supports building infrastruc- ture and the institution’s climate agenda, while also contrib- uting to the wider foundations of resilient and sustainable growth. Expected Outcomes The project is expected to generate about 219.1 GWh of electricity annually once in operation. A substantial share of that output is expected to be exported to India during the period from May to October, while the project will also contribute to a stronger overall domestic supply base. In Bhutan’s context this matters not only because it adds re- newable generation, but also because it supports the wider economics of the power sector, which remains central to the country’s fiscal and external performance. Gamri-II is also notable for the way it is designed. By using discharge from the upstream Gamri-I project it aims to optimize existing water resources and reduce the need for larger additional hydraulic structures. This supports a more efficient infrastructure model and helps position the invest- ment within Bhutan’s wider effort to build a phased portfolio of smaller and medium-sized hydropower assets. In policy terms this is important because Bhutan is seeking not only to expand power generation, but to do so in a way that sup- ports long-term energy security and efficient use of capital.

The broader development significance extends beyond the power sector. Hydropower exports remain central to Bhutan’s external accounts and public finances, while reliable electricity is increasingly important for domes- tic industry, services and household welfare. Additional renewable generation can therefore support growth, energy system stability and a development trajectory that remains closely tied to low-carbon infrastructure. In Bhutan, hydropower continues to play an economic and a strategic role. Assessment According to the Joint MDB Methodology for Tracking Climate Finance The Gamri-II 55 MW Hydropower Project was assessed as 100 percent climate finance, all of which is mitigation financing. Following the Joint MDB Methodology the assessment was reached because the project’s central purpose is the generation of renewable electricity through hydropower. As a run-of-river renewable energy project it contributes directly to lower-emission electricity generation and supports displacement of more carbon-intensive alter- natives within the regional energy mix. The mitigation logic is therefore straightforward and fully aligned with established climate finance practice for renewable power investments. While the project also has wider developmental and energy-security implications, its climate finance classi­ fication is best understood through its mitigation contri- bution. It supports Bhutan’s carbon-negative development model, reinforces the role of hydropower within the country’s energy strategy and contributes clean electricity to both domestic and cross-border markets. In the context of this Climate Finance Report, this makes it a clear example of a project where the climate rationale is fully and directly embedded in the core investment objective. Overall, the Gamri-II project illustrates how renewable energy infrastructure can serve several national objectives at once: expanding clean energy generation, supporting export capacity, strengthening economic resilience and reinforcing a low-carbon development pathway.

60

61

Powered by