Chapter 6 | PROJECTS
The OPEC Fund is financing the Gamri-II 55 MW Hydropower Project in eastern Bhutan to expand renewable energy generation and strengthen the country’s power system. The project forms part of Bhutan’s broader small and medium- sized hydropower development program and is designed as a run-of-river scheme that makes use of discharge from the upstream Gamri-I plant, reducing the need for major additional headworks while improving the use of existing water resources. Once operational, the project is expected to generate about 219.1 GWh of electricity annually and contribute to both domestic energy security and electricity exports to India.
BHUTAN
Gamri-II 55 MW Hydropower Project
country’s long-term low-carbon growth model and reducing vulnerability to more carbon-intensive alternatives. 6
Project Details
International indices reflect this mixed picture. The latest ND-GAIN profile gives Bhutan an overall score of 48.2, ranking it 101st globally. Bhutan is ranked as the 41st most vulnerable and 65th most ready country, pointing to a com- bination of relatively high climate risk exposure and mod- erate readiness to mobilize and deploy adaptation invest- ments. This suggests that Bhutan has institutional capacity to absorb climate investment, but still faces material climate risks, especially in sectors shaped by water, geography and infrastructure exposure. 7
• Total project cost: US$61.8 million • OPEC Fund contribution: US$47.3 million • Type of financial instrument: Loan • OPEC Fund climate finance as percentage: 100 percent climate finance, all of which is mitigation financing • Approved: December 2025 • Signed: June 2026
COUNTRY DETAILS
Climate Finance
Priorities
SITUATION ANALYSIS OF CLIMATE IMPACTS
Figure 2: Bhutan ND-GAIN Ranking 8
all of which is mitigation financing 100 %
Driving Climate Action Support for Climate Mitigation, Adaptation and Nature-based Solutions
Bhutan is widely recognized for its carbon-negative status, but that should not obscure the complexity of its climate and development challenge. The country’s economic model remains closely tied to hydropower, tourism and a narrow set of external linkages, while its mountainous terrain leaves infrastructure and communities exposed to landslides, flooding and glacial lake outburst floods. Climate change is expected to intensify these pressures by affecting hydrolo- gy, mountain ecosystems, infrastructure stability and rural livelihoods. In Bhutan, water is both a strategic development asset and a source of growing climate risk. 5 That tension is especially visible in the energy sector. Hydro- power has long been one of Bhutan’s principal engines of growth and a major source of exports and public revenue, but seasonal variability in water availability has become increasingly consequential. During the summer months Bhutan exports surplus electricity to India, while lower firm generation in winter has increasingly required imports to meet domestic demand. Rising consumption, project delays and climate-related pressures on water flows have made the energy system more exposed to seasonal shortfalls. In this context, expanding renewable generation is not only a matter of adding capacity. It is also a way of reinforcing the
50
45
40
35
30
Climate Profile
Building Infrastructure Improved connectivity, water and sanitation and digital infrastructure, enhanced access to hydrology, energy and social infrastructure
25
• The latest ND-GAIN profile gives Bhutan an overall score of 48.2, ranking it 101st globally . Bhutan is ranked as the 41st most vulnerable and 65th most ready country. • This points to a combination of relatively high climate risk exposure and moderate readiness to mobilize and deploy adaptation investments. • It suggests that Bhutan has institutional capacity to absorb climate investment, but still faces mate- rial climate risks, especially in sectors shaped by water, geography and infrastructure exposure.
Purpose of the Loan The purpose of the loan is to help finance a new 55 MW hydropower plant that will expand Bhutan’s renewable electricity generation capacity and support a more reliable balance between domestic demand and export potential. The project sits within Bhutan’s effort to develop smaller and medium-sized hydropower schemes as part of a wider strategy to strengthen energy security, improve utilization of its renewable resource base and support long-term eco- nomic transformation. 9
The development rationale is broader than generation alone. Bhutan’s domestic electricity demand has risen