Zimbabwe was heavily affected by an economic collapse in 2008, when GDP contracted by 17 percent amid hyperinflation. Macroeconomic reforms, including the introduction of a multi-currency regime in 2009, supported a return to growth, but conditions in rural areas remained difficult. According to the 2015 Poverty Atlas, more than three-quarters of the rural population lived in poverty, exceeding 85 percent in some districts. Most rural households depended on food purchases, casual work, and humanitarian aid to meet basic nutritional needs. Smallholder irrigation schemes performed poorly, largely due to unreliable water supply and weak production systems. Yields reached only 30–50 percent of potential, reflecting limited use of improved inputs, labor shortages, and inefficient farming practices. In 2017, the OPEC Fund approved a US$15 million loan for the Smallholder Irrigation Revitalization Project (SIRP) in Zimbabwe, a US$51.28 million project co- financed with IFAD and the Government of Zimbabwe. US$ 15 m In 2017, the OPEC Fund approved a loan for the Smallholder Irrigation Revitalization Project (SIRP) in Zimbabwe SIRP focused on rehabilitating existing smallholder irri- gation schemes in Manicaland, Masvingo, Matabeleland South and Midlands. These semi-arid regions contain about 49 percent of all smallholder irrigation land, accounting for 64 percent of Zimbabwe’s land area

and host over 65 percent of the rural population. SIRP aimed to reduce rural poverty by helping households achieve increased food and nutrition security, as well as more resilience to climate and economic shocks. The OPEC Fund supported major infrastructure rehabilitation, mainly providing comprehensive upgrades to irrigation systems (including headworks, conveyance systems, storage tanks, on-farm water structures, access roads and fencing), as well as building and/or rehabilitating farm roads (drainage, pothole graveling, culverts and small bridges). The project also funded the construction of a multipurpose post-harvest management center with storage, a cold room, gathering spaces and offices for business clubs. Project implementation started in 2019 and completion was reached in November 2024. As a result of the project, 4,780 ha of small-scale irrigation schemes were revitalized (against the target of 5,502 ha). The project reached 35,452 farmers with agricultural assets, inputs, and services, surpassing the target of 27,500. Of the total, 20,975 beneficiaries were women farmers. In contrast, road rehabilitation fell short of target, with only 12 km of the originally expected 100 km of roads refurbished under the project itself – the government itself refurbished 90.5 km of roads outside the project. Overall, the program achieved several important outcomes, such as the household assets ownership index increasing from 49 percent to 65 percent, with 86 percent of households reporting the adoption of environmentally sustainable and climate-resilient technologies and practices, far exceeding the 61 percent target.

Connectivity between the northern urban areas and the southern rural areas of Vinh Yen City in Vinh Phuc Province was limited by the lack of a direct, high-capacity crossing over Dam Vac Lake. This constrained mobility, increased travel times and reduced access to economic opportunities and public services, particularly for rural communities. The absence of an efficient transport link also limited the city’s ability to fully integrate with the national highway network, thereby constraining economic growth, trade and overall socio-economic development in the area.

396,000 The bridge served an estimated

users in 2023, with demand continuing to grow to an estimated 479,160 users by 2025

impact, the bridge served an estimated 396,000 users in 2023, with demand continuing to grow to an estimated 479,160 users by 2025, underscoring the project’s contribution to improved mobility, economic activity and the longer-term socio-economic development of the region.

US$ 21.8 m The OPEC Fund approved a loan for the Dam Vac Bridge Project

To address these challenges, in 2016 the OPEC Fund approved a US$21.8 million loan for the Dam Vac Bridge Project. It involved the construction of a 310.7 m long bridge over Dam Vac Lake, associated approach roads, sidewalks and decorative pylon towers, designed in accordance with national urban road and bridge standards. Construction commenced in October 2020 and was finalized in 2023. The bridge has significantly improved connectivity between urban and rural areas of Vinh Yen City, enhanced traffic flow and strengthened links to the national road network. In terms of usage and