CHAPTER 4
CHAPTER 4
OPEC FUND PROJECT RESULTS
Figure 22 | Regional (left) and sectoral (right) distribution of non-trade projects completed/reaching EOM between July 2024 and June 2025
39+35+2+24+H 42+30+3+25+H 30+50+20+H % REGIONAL DISTRIBUTION PUBLIC SECTOR PRIVATE SECTOR 39 42 30 35 30 50 2 3 24 25 20 Africa Africa LAC Asia 11+31+4+9+11+2+17+15+H % SECTORAL DISTRIBUTION 11 31 17 15 Water & Sanitation Health 11 9 4 2 Transport Energy Multisector 2
Agriculture
LAC
Financial sector
As in previous years, the OPEC Fund has conducted an in-depth review of the documented results of projects completed during the latest review period (July 2024- June 2025). The 2024–2025 assessment encompassed 46 non-trade operations and 26 trade finance projects that were completed or achieved Early Operating Maturity (EOM) 80 between July 2024 and June 2025, 81 of which the total commitments amounted to US$3.3 billion. 82 Further details on the reviewed operations can be found on the next page.
representing the second largest share (35 percent, Figure 22). Banking and financial services (31 percent), trans- port and storage (17 percent) and water and sanitation (15 percent) were the most highly represented sectors among the projects that were recently completed or had matured. Public sector operations accounted for 15 of the 18 projects implemented in Africa, with the continent accounting for 42 percent of the non-trade sovereign operations reviewed, followed by Asia (30 percent of sovereign operations) and Latin America and the Carib- bean (25 percent of sovereign operations). Of private sector operations, the largest number of projects (five) were implemented in Asia, three in Africa, as well as two in Latin America and the Caribbean, representing 50, 30 and 20 percent, respectively ( Figure 23 ). Public sector projects were distributed across multiple sectors, with transport and storage (22 percent) and water and sanitation (19 percent) accounting for the largest shares. Private sector projects provided support predomi- nantly through financial intermediaries ( Figure 24 ). Of the 46 non-trade projects, 37 (35 public sector and 2 private sector) were co-financed with other develop- ment finance institutions. When co-financing with others, the OPEC Fund’s share in the total financing package provided to governments or private sector clients ranged from 6 to 89 percent (in the case of a very large public sector project), with a median financing share of 31 percent and an average of 37 percent.
Europe
Asia
Education
Figure 23 | Regional distribution of public (left) vs. private (right) sector non-trade projects analyzed
LAC
Africa
Europe
Asia
CHARACTERISTICS OF THE PORTFOLIO OF COMPLETED/MATURED PROJECTS REVIEWED
14+14+6+8+14+3+22+19+H 14 14 22 19 3 14 6 8 Health PUBLIC SECTOR
90+10+H PRIVATE SECTOR 90 10
Figure 24 | Sector distribution of public (left) and private (right) sector non-trade projects analyzed
Between July 2024 and June 2025, 46 non-trade operations (36 in the public sector and 10 in the private sector) reached completion/EOM. More than a third of operations analyzed were in Africa (39 percent), with Asia
Energy
Water & Sanitation
Agriculture
Financial sector
Transport & Storage
Education
Energy
80 For the private sector, the concept of early operating maturity (EOM) is utilized instead of completion as EOM determines the timing of project evaluation for private sector projects. As defined by the Evaluation Cooperation Group’s Good Practice Standards (ECG-GPS), EOM for real sector projects happens after about 18 months of operations, for financial sector projects after 2 years following the last material disbursement, and 3 years after the last material disbursement for corpo- rate projects. More details in Annex 2 of https://www.ecgnet.org/sites/default/files/GPS4%20-%20ECG%20FINAL%20-%2008Nov11.pdf. 81 For details on methodology see Annex III. 82 The commitments amounted to US$2.2 billion for public sector projects, US$342 million for private sector projects and US$774 million for trade finance projects.
Financial sector
Multisector
74