Development Effectiveness Report 2025

AN ECOSYSTEM OF RESULTS

Results of OPEC Fund operations completed between 2018 and mid-2025.

651,373

roads built/­ rehabilitated (+246) 11,809 km

households with new or improved water

connections (+389,063)

healthcare facilities built/upgraded (+318) 438

3.49 m

households supported with emergency or other financial assistance (no change) 340,800

transmission lines built/ rehabilitated (+8,799) 24,522 km

households with new or improved electricity

connections (+305,005)

in trade facilitated (+774 m) US$ 3.9 bn

MSMEs financed (+6,460) 354,451

of water pipes/ trunk systems (+1,254) 13,253 km

educational facilities built/upgraded (+7) 174

farmers benefited (+82,045) 2.26 m

women empowered (+247,944) 789,180

annual users of transport infrastructure (+2.67 m) 3.47 m

students benefited (+14,241) 224,462

measures for stronger institutions and legal frameworks (+59) 59

population benefiting from health projects (+1.38 m) 33.94 m

(+131) in energy capacity installed/refurbished (of which 1,504 MW renewable ; no change) 6,159 MW

of land improved (+11,562) 410,451 ha

jobs supported (+54,921) 213,234

10

11

Additions in brackets refer to results of OPEC Fund projects completed in the latest annual review period (mid-2024 to mid-2025). See Chapter 4 for further detail.

Powered by