Chapter 6 | PROJECTS
Chapter 6 | PROJECTS
Purpose of the Loan The purpose of the loan is to help finance a modern, elec- trified rail corridor that can improve the efficiency, relia- bility and strategic role of Tanzania’s transport system. The Uvinza–Malagarasi section is designed to connect with the wider standard gauge railway network already under devel- opment and to strengthen the Central Corridor’s role as a multimodal trade route linking the Port of Dar es Salaam to inland regions and neighboring countries. By doing so, the project is intended to reduce transport costs, shorten travel times and expand access to markets for both Tanzania and the wider region. The development rationale is broader than rail construction alone. Tanzania’s existing meter gauge and cape gauge systems are in poor condition, carrying only a fraction of their design freight capacity. As traffic shifted toward roads, the result has been higher logistics costs, greater congestion, more accidents and lower competitiveness for agriculture, mining and trade. A modern electrified railway is therefore meant to address several constraints at once: it improves corridor efficiency, supports regional integration, reduces pressure on roads and creates a stronger backbone for long-distance freight movement. The project aligns most directly with SDG 9 (Industry, Innovation and Infrastructure) through strategic transport infrastructure, SDG 8 (Decent Work and Economic Growth) through trade facilitation and support for productive sectors and SDG 13 (Climate Action) through the lower- emission transport model associated with electrified rail. In the context of the OPEC Fund’s Strategic Framework 2030 the project clearly supports building infrastructure, while also contributing to economic integration and the institu- tion’s broader climate agenda. Expected Outcomes The project is expected to deliver national and regional development benefits. At the most immediate level, it will create a 156 kilometer electrified standard gauge rail section that links Uvinza to the Malagarasi area near the Burundi border and connects onward to the broader Tanzania Standard Gauge Railway (SGR) network, currently under construction and partly in operation. This is expected
to strengthen the capacity and continuity of the Central Corridor, improve interoperability with the wider standard gauge system and support a modal shift toward rail for long-distance freight. The wider significance lies in what this means for trade and connectivity. Tanzania serves as an international gateway for several neighboring countries and improving the performance of its rail network has implications for regional commerce, logistics costs and access to global markets. The project is expected to reduce transport time and cost for corridor users, ease pressure on road networks and help unlock economic potential in inland and mineral-rich areas of Tanzania and Burundi. In combination with parallel investments in the port of Dar es Salaam and the broader SGR program it can support a more efficient regional trans- port architecture. There is also an important systems effect. By shifting part of freight demand from road to electrified rail the project can reduce congestion, lower road maintenance pressure and improve transport safety over time. Tanzania’s road system currently carries the vast majority of freight, while road fatality rates remain high. Strengthening rail therefore offers benefits not only in logistics efficiency, but also in environmental performance and broader transport sustain- ability. Assessment According to the Joint MDB Methodology for Tracking Climate Finance Using the MDB Joint Methodology, the Regional Standard Gauge Railway Project, Uvinza–Malagarasi Section, was assessed as 100 percent climate finance, comprising 20 percent adaptation finance and 80 percent mitigation finance. The mitigation rationale is clear and substantial. The project supports a shift toward electrified rail transport, which is less emissions-intensive than the road freight alternatives that currently dominate the corridor. By expanding rail capacity and improving the competi- tiveness of rail for long-distance freight movement, the project can contribute to lower greenhouse gas emissions associated with transport growth. This is consistent with
the Joint MDB Methodology for mitigation finance, under which lower-carbon transport infrastructure qualifies where it supports a credible shift from more carbon- intensive modes. The adaptation component is also well-grounded. The Central Corridor already faces flood risk and broader climate-related infrastructure stress and the project contributes to a more resilient transport network in a passageway that is economically and strategically critical. The investment is not only about decarbonizing transport.
It is also about improving the continuity and reliability of transport services under conditions of climate variability and rising physical risk.
Overall, the project is a strong example of how large transport infrastructure can serve both development and climate objectives at once. The Uvinza–Malagarasi section is not only a railway investment. It is also a strategic investment for Tanzania in regional integration, economic competitiveness, cleaner freight movement and more resilient transport infrastructure.
88
89
Powered by FlippingBook